Repair of Earthquake Damages and Strengthening Works at Docks 3 and 4 – İskenderun, Hatay, Türkiye
Employer : LimakPort İskenderun International Port Management Co.
Start Date : 15.08.2023
Finish Date : 07.11.2024
Scope of Work :
1. Structural Strengthening of Steel Piles and Pile Capping Beams at Axis C & D (total piles 286.00 nos)
1.a. Surface cleaning of existing steel piles up to elevation -2.00 m by water-jetting application
1.b. Welding steel plates on pile surface to provide the grout is properly adhere to pile surface
1.c. Placing 12 nos 600 mm length Ø26mm reinforcing bar anchors to capping beam around the pile including vertical reinforcement bar and spiral stirrup installation
1.d. Manufacturing Ø1400mm diameter, 5 mm thick, bottom face closed and outer surface 500 micron epoxy painted steel jacket and installation around the pile after reinforcing is completed
1.e. Filling high strength flowing special grout between pile and steel jacket
1.f. Filling the gap between grout and concrete capping beam wit high strength repair material
Pile Cap After the Earthquake, Before Strengthening
Welding Steel Plate for Adhering of Grout with Pile Surface
Welding Steel Plate for Adhering of Grout with Pile Surface
Drilling Holes on Pile Cap Beams
Installing Anchor Bars Using Epoxy
Steel Jacket Installation Around the Pile
Repairing Pile Cap Concrete
Filling High Strength Special Material Inside The Steel Jacket
Pile Cap Beam and Steel Pile after Strengthening is Completed
Employer : LimakPort İskenderun International Port Management Co.
Start Date : 15.08.2023
Finish Date : 07.11.2024
Scope of Work (contd.) :
2. Repair Damages on Existing Concrete Beams at Axis B & D and Another Structural Elements of the Dock (2,920.00 sq.m)
2.a. Breaking rf concrete surfaces, thickness between 30.00 – 100.00 mm
2.b. Cleaning the concrete surface after breaking
2.c. Application of cement based corrosion protection material
2.d. Concrete repair using high-strength, cement based repair material, thickness between 30.00 – 100.00 mm
2.e. Application of cement based elastomeric water insulation material over the repaired surfaces
Reinforced Concrete Beam Repairs at Dock
Employer : LimakPort İskenderun International Port Management Co.
Start Date : 15.08.2023
Finish Date : 07.11.2024
Scope of Work (contd.) :
3. Steel Bracing on B Axis Concrete Beams (total 88 nos beams)
3.a. Breaking rf concrete surfaces, thickness between 30.00 – 100.00 mm (728.64 sq.m)
3.c. Provide and install anchor rod including anchoring epoxy material filling inside the hole (Ø30mm, L1,300.00-1,800.00mm, Gr.8.8, full length treated stud, 2,112.00 nos)
3.d. Provide and install steel plate (3,000.00mmx220.00mmx22.00mm, S355 quality, 352.00 nos)
3.e. Filling high-strength, cement based grout over and under the plates